Blida - APS
Minister of Energy, Youcef Yousfi, ensured Thursday in Blida, that the two trains, restarted of the gas complex Tiguentourine, targeted by a terrorist attack in January 2013, are operating "normally" and "without any problem." "There is no problem in the running of the two operational trains. Tiguentourine complex will resume its optimum production after the completion of the works in the third train," Yousfi told APS, on the sidelines of a working and inspection visit to the province. The repair works of the third train of gas production are underway and should be completed "very soon," affirmed the minister.