Presidential Advisor and Head of the Atomic Energy Organization of Iran Fereydoon Abbasi said on Saturday that Bushehr nuclear power plant with a 320 megawatt capacity was connected to nationwide gird for 15 hours Wednesday night. Abbasi made the remark on the sidelines of the special ceremony held to unveil special softwares used during eight years of Sacred Defense. Bushehr nuclear power plant will operate with 75 percent of its capacity by mid- November this year, he said. Bushehr Nuclear power plant will generate 420 megawatts of electricity when operating at full swing, he said. Transferring and installation of centrifuges to Fordo site is underway based on its timetable, Abbasi said.
GMT 12:31 2017 Sunday ,24 December
SpaceX launches 10 more satellites for IridiumGMT 18:48 2017 Tuesday ,12 December
Bitcoin makes muted stock exchange debut at $15,000GMT 18:19 2017 Saturday ,09 December
France to allow trading of securities via blockchainGMT 07:39 2017 Thursday ,16 November
Cygnus cargo ship arrives at space stationGMT 17:49 2017 Sunday ,12 November
Aircraft overhead forces Orbital to cancel cargo launchGMT 19:18 2017 Wednesday ,01 November
Sony revives robot pet dogGMT 10:31 2017 Saturday ,28 October
Saudi Arabia Becomes First Country to Grant Citizenship to RobotGMT 17:46 2017 Saturday ,21 October
Spacewalkers fix robotic arm in time to grab next cargo shipMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor